What is Tungsten West?
Tungsten West plc (AIM: TUN) is a UK mining company that owns and is restarting the Hemerdon tungsten and tin mine near Plymouth in Devon. Hemerdon began processing ore in September 2026 and is being brought back in stages, with full plant commissioning targeted for Q1 2027. The UK government's National Wealth Fund is a shareholder and lender.
Hemerdon, also known as the Drakelands mine, is one of the largest known tungsten deposits outside China. It produced tungsten during both World Wars and again from 2015 to 2018 under Wolf Minerals, which failed. Tungsten West bought the project in 2019 from Hargreaves (UK) Services, which had acquired it out of receivership.
| Ticker | AIM: TUN (London Stock Exchange, quoted in pence) |
| Main asset | Hemerdon (Drakelands) tungsten-tin mine, Devon, UK, 100% owned |
| Stage | Restart under way; processing since 15 Sept 2026 |
| Full commissioning target | Q1 2027 |
| Share price | ~26.5p (20 Nov 2026) |
| 52-week range | 7.5p–52.6p |
| Market value | ~£427 million |
| Shares in issue | 1,356 million ordinary + 257 million non-voting B shares |
| Cash | £25.5 million (31 Mar 2026), before the August 2026 funding |
Sources: AJ Bell (price and market value, 20 Nov 2026); Tungsten West investor relations (share count, 1 Oct 2026); annual report to 31 March 2026.
Tungsten West share price: what has moved it
The shares rose from about 11.3p at the start of 2026 to a high of 52.6p, then fell back to about 26.5p by 20 November. That is still more than double the January level, but about half the peak.
| Date | Event | Price reference |
|---|---|---|
| Early Feb 2026 | Upgraded project economics push shares to a three-and-a-half-year high | Closed at 29.5p on 4 Feb |
| 6 Feb 2026 | £41.4 million placing and subscription, more than 2.5 times oversubscribed, plus a ~£3 million retail offer | Issued at 18p |
| 25 Aug 2026 | National Wealth Fund invests up to £71 million | Shares jump as much as 17% (Bloomberg); fund subscribes at 36p |
| 15 Sept 2026 | Hemerdon enters production | Shares traded up to 49.6p over the following 50 days (MarketBeat) |
| 5 Nov 2026 | Court approves a capital reduction, allowing future dividends | No change to share count |
| 20 Nov 2026 | Shares fall 9.25% in a day, while the FTSE AIM 100 falls 2.5% | ~26.5p |
Three things explain most of the moves:
- Funding. Before February 2026 the company had almost no cash: £0.02 million at 31 March 2025. The February raise and the National Wealth Fund deal removed the immediate funding risk, and the shares re-rated.
- Tungsten prices. The feasibility study's base case used US$400 per mtu. European ammonium paratungstate (APT), the benchmark tungsten product, was about US$2,675 per mtu in late October 2026 (tungsten price explained). Higher prices transform the economics of a low-grade mine like Hemerdon.
- Sector sentiment. Critical minerals stocks fell sharply in November 2026 (critical minerals stocks), and Tungsten West has also fallen since its autumn highs.
The Hemerdon mine: reserves and production plan
Hemerdon is large but low grade. Its value comes from scale and from about US$300 million of infrastructure that Wolf Minerals built, including the processing plant, tailings storage and a pre-stripped open pit.
| Ore Reserve (1 May 2025) | Tonnes | WO₃ grade | Tin grade |
|---|---|---|---|
| Granite | 35.6 Mt | 0.18% | 0.03% |
| Killas (host rock) | 35.0 Mt | 0.11% | 0.03% |
| Total Proved and Probable | 70.7 Mt | 0.15% | 0.03% |
Source: Hemerdon Feasibility Study, AMC Consultants, effective 30 June 2025. 70.7 Mt at 0.15% contains roughly 106,000 tonnes of WO₃ (our calculation).
Key points from the 2025 feasibility study:
- Throughput: 3.5 million tonnes a year of primary ore feed.
- Output: about 332,000 mtu of WO₃ (about 3,300 tonnes of WO₃) and about 462 tonnes of tin in concentrate a year at steady state, plus aggregates for construction. The plant can be expanded to about 500,000 mtu a year with limited extra capital, the company says.
- Mine life: 11 years of open-pit mining within the current planning permission, which runs to June 2036, then processing of stockpiles.
- Restart cost: about US$93 million.
- Economics: post-tax net present value (NPV) of US$190 million at a 7.5% discount rate and an internal rate of return (IRR) of 29.3%, using a tungsten price of only US$400 per mtu.
The National Wealth Fund expects about 45,000 tonnes of tungsten over the mine's life. For comparison with another non-Chinese restart, see our Almonty stock profile, which covers Sangdong in South Korea.
The three-stage restart
| Stage | Timing | What happens |
|---|---|---|
| 1 | From August 2026 | Reprocessing existing stockpiles and soft rock with a mobile wash plant and crusher, feeding the fines gravity circuit |
| 2 | Q4 2026 | Recommissioning the coarse gravity circuit and expanding mining |
| 3 | Q1 2027 | Completing new crushing, screening and ore-sorting plant, and commissioning at nameplate capacity |
Source: Tungsten West annual report, year to 31 March 2026.
How Tungsten West is funded
| Funding | Date | Amount | Terms |
|---|---|---|---|
| Convertible loan notes | 2025 | £5.2 million | Converted to shares in Dec 2025 and Feb 2026 |
| Placing, subscription and retail offer | Feb 2026 | ~£43 million gross | 18p per share; £29.3 million from one international investor |
| National Wealth Fund equity | Aug 2026 | £36 million | 100 million shares at 36p, about 7.4% of voting rights |
| National Wealth Fund loan | Aug 2026 | £25 million, plus £10 million uncommitted | 366-day term; interest about 9% a year, rising quarterly (Kalkine) |
The company says it is fully funded to full production. In return for its investment, the UK government has an exclusive period to negotiate an offtake agreement for up to 50% of Hemerdon's planned tungsten output for up to 10 years. That deal has not been signed yet.
The large loss in the accounts is not cash. Tungsten West reported a loss of £175.4 million for the year to 31 March 2026, but £167.3 million of that was a non-cash charge from converting its loan notes after the share price rose. Its operating loss was £7.9 million.
Why Hemerdon matters for tungsten supply
China mined about 79% of the world's tungsten in 2025, according to the USGS, and licenses its exports (China's tungsten export controls). Western buyers want supply from allied countries. From 1 January 2027, US defence contracts must exclude tungsten mined or processed in China, Russia, North Korea or Iran (the DFARS tungsten rule explained). The UK is not one of those countries, so Hemerdon concentrate could serve that demand.
The company has said Hemerdon could supply more than 20% of non-Chinese tungsten. With Sangdong in South Korea and Boguty in Kazakhstan, it is one of the main new sources of supply outside China (where tungsten is mined).
Key risks for Tungsten West shareholders
- Ramp-up execution. Wolf Minerals failed at the same mine after poor plant reliability, sub-optimal ore feed and metallurgical problems. Tungsten West has redesigned parts of the circuit, adding ore sorters and new fine-particle recovery, but it has not yet operated at full scale.
- Short-term debt. The National Wealth Fund loan runs for 366 days from August 2026, so it must be repaid or refinanced in the second half of 2027. Interest rises each quarter. The funding plan also relies on about £15 million of sales revenue before peak funding.
- Permits and community. The mobile crushing plant runs under a temporary Environment Agency position; a consultation on making it permanent closes on 11 December 2026. Noise and dust complaints hurt Wolf Minerals.
- Mine life. The current planning permission limits mining to June 2036, so extending the life would need new permissions.
- Tungsten price. Prices are far above the US$400 per mtu base case, but they are volatile and depend on Chinese policy.
- Offtake not signed. The UK government offtake is still under negotiation.
- Dilution. The share count has grown sharply through placings and conversions, and further raises are possible if the ramp-up slips.
How Tungsten West compares with other tungsten stocks
| Company | Ticker | Main asset | Stage |
|---|---|---|---|
| Tungsten West | AIM: TUN | Hemerdon, UK | Restart; full commissioning targeted Q1 2027 |
| Almonty Industries | Nasdaq: ALM | Sangdong, South Korea; Panasqueira, Portugal | Producer |
| EQ Resources | ASX: EQR | Mt Carbine, Australia; Spain | Producer |
| Abenójar Tungsten | LSE: ABT | El Moto, Spain | Developer |
| American Tungsten | TSX-V: TUNG | IMA Mine, Idaho, US | Developer (profile) |
See the full list of tungsten stocks, or weigh the sector's bull and bear case in is tungsten a good investment?
How to buy Tungsten West shares
- Use a UK share-dealing platform or an international broker with London Stock Exchange access, and search for TUN or "Tungsten West".
- AIM shares can usually be held in a stocks and shares ISA or SIPP, and are generally exempt from UK stamp duty.
- Check the spread and liquidity: AIM shares can have wide bid–offer spreads and move sharply on news.
- Read the company's latest announcements on the London Stock Exchange before trading.
Where Pure Tungsten fits
Pure Tungsten Inc. is a private tungsten company that is also restarting existing assets outside the DFARS covered countries. It is restarting the Ssangjon mine in South Korea, which has a fully built mill, with production targeted for Q4 2026 at 1,000 tonnes a year. It is also advancing Maykhura in Tajikistan in joint venture with TALCO: about 2 million tonnes at 0.93% WO₃ plus about 900,000 tonnes of tailings at about 0.4% WO₃, with a JORC (Joint Ore Reserves Committee) report expected in Q1 2027. The company targets 4,000 tonnes a year by 2028.
Unlike Tungsten West, Pure Tungsten is not listed. It is raising C$10 million at C$0.80 per share (minimum C$5,000, about C$240 million pre-raise valuation) ahead of a planned IPO or reverse takeover in London or New York in H2 2027. Pre-IPO shares are illiquid and high risk: a listing can be delayed, and restart projects can face the same ramp-up, metallurgy and funding challenges described above. Read about Pure Tungsten's IPO plans, our guide to pre-IPO mining investment, or request the Pure Tungsten investor pack.
What to watch next at Tungsten West
- Q4 2026: recommissioning of the coarse gravity circuit (Stage 2).
- 11 December 2026: close of the Environment Agency consultation on the mobile crushing plant.
- December 2026: half-year results to 30 September, the first accounts covering production.
- Q1 2027: full plant commissioning at nameplate capacity (Stage 3).
- 2027: a signed UK government offtake, and repayment or refinancing of the National Wealth Fund loan.
This article is general information based on public company disclosures, not investment advice. Check Tungsten West's latest announcements and a live share price before making any decision.